New Performer GPL 980 pipelayers at work for the TANAP project

Three more Performer GPL 980 pipelayers operating in Georgia: the best pictures

After the first group of 2 Performer GPL 980 pipelayers operating at approximately 90 km from the coast of Azerbaijan – near the Shah Denyz field – a second group of three Euro Pipeline Equipment machines is already at work in Georgia at the ENI-SAIPEM construction work sites.

The pipelaying machines – able to lift up to 98,000 kg and guarantee continuous workflow 24/7 even in the event of malfunctioning of one of the components which can be dismantled – are used in the TANAP Project, the mega-gas pipeline that will transport energy through five different countries: Albania, Greece, Turkey, Georgia and Azerbaijan.

Euro Pipeline Equipment: a new era of pipelayers

The Performer GPL 980 is a modern machine with a futuristic design. It is shipped with its parts disassembled and placed inside of normal open top containers, a characteristic that ensures maximum savings in terms of shipping times and costs.

Moreover, the re-assembly procedure is in fact must faster than the one for normal machines, allowing for saving up to 80% on shipping costs.

Scroll down to see all the pictures and click on the following link for more technical information on the Performer GPL 980.