<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda::$AMP is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/iubenda_cookie_solution.php</b> on line <b>109</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda::$forms is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/iubenda_cookie_solution.php</b> on line <b>110</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda::$settings is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/iubenda_cookie_solution.php</b> on line <b>111</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>iubenda</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-includes/functions.php</b> on line <b>6260</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda_Settings::$legal_notices is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/includes/settings.php</b> on line <b>51</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda_Settings::$tag_types is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/includes/settings.php</b> on line <b>72</b><br />
{"id":1390,"date":"2016-06-27T08:19:34","date_gmt":"2016-06-27T08:19:34","guid":{"rendered":"http:\/\/europipeline-equipment.com\/sito\/?p=1390"},"modified":"2021-03-17T14:27:47","modified_gmt":"2021-03-17T14:27:47","slug":"saipem-chooses-performer-gpl","status":"publish","type":"post","link":"https:\/\/www.europipeline-equipment.com\/sito\/saipem-chooses-performer-gpl\/","title":{"rendered":"SAIPEM CHOOSES ONCE AGAIN EURO PIPELINE EQUIPMENT: READY-MADE 10 PERFORMER GPL 980"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>Saipem \u2013 Societ\u00e0 Azionaria Italiana Perforazioni e Montaggi<\/em>, worldwide leading company in engineering services, drilling and building big plants and oil &amp; gas onshore and offshore pipelines, has once again chosen to rely on Euro Pipeline Equipment for a huge project which will carry up to <strong>10 billions cubic meters of gas across Europe<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After the 16 machinery purchased by SICIM and sent to Turkey to build the TANAP Project, other 10 Performer GPL 980 have been requested in Azerbaijan and Georgia.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/staging.europipeline-equipment.com\/sito\/wp-content\/uploads\/2016\/06\/Saipem-chooses-Performer-GPL-980.jpeg\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/staging.europipeline-equipment.com\/sito\/wp-content\/uploads\/2016\/06\/Saipem-chooses-Performer-GPL-980-1024x683.jpeg\" alt=\"Saipem chooses Performer GPL 980 by Euro Pipeline Equipment\" class=\"wp-image-1394\" srcset=\"https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2016\/06\/Saipem-chooses-Performer-GPL-980-1024x683.jpeg 1024w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2016\/06\/Saipem-chooses-Performer-GPL-980-300x200.jpeg 300w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2016\/06\/Saipem-chooses-Performer-GPL-980-768x512.jpeg 768w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2016\/06\/Saipem-chooses-Performer-GPL-980.jpeg 1800w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A first group of 5 Performer GPL 980 &#8211; pipelayer machines with a Max Lift capacity 98.000 Kg able to guarantee a continuous work flow &#8211; will operate soon around Shah Denyz Oilfield, located 90 Km far from Azerbaijan coast, to contribute to the building of <em>SCXP &#8211; South Caucasus Pipeline Expansion Project<\/em>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The pipeline will be of strategic value for the energy provision all over Europe: it will connect, in fact, Caspian Sea Oilfield both to TANAP project in Turkey and to TAP, the pipeline bringing Gas from Albania to Salento Region (Italy).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is a confirmation of trust in our Firm made by an absolute prestigious International Company.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SAIPEM and our&nbsp;special machines PBM-4860<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\"><em>Saipem<\/em>, in fact, had already entered in Euro Pipeline Equipment clients list through pipe bending special machines PBM-4860 order, now operating in Georgia.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more info about <a href=\"https:\/\/staging.europipeline-equipment.com\/sito\/flv_portfolio\/pipelayer-gpl-980-performer\/\" target=\"_blank\" rel=\"noopener noreferrer\">Performer GPL 980<\/a> and about <a href=\"https:\/\/staging.europipeline-equipment.com\/sito\/products\/\" target=\"_blank\" rel=\"noopener noreferrer\">our excellent machinery<\/a> just click on the link.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><em>For requesting more info just fill the specific form in the <a href=\"https:\/\/staging.europipeline-equipment.com\/sito\/contact-us\/\" target=\"_blank\" rel=\"noopener noreferrer\">Contact page<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Saipem \u2013 Societ\u00e0 Azionaria Italiana Perforazioni e Montaggi, worldwide leading company in engineering services, drilling and building big plants and oil &amp; gas onshore and offshore pipelines, has once again chosen to rely on Euro Pipeline Equipment for a huge project which will carry up to 10 billions cubic meters of gas across Europe. After [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[107,79,108,91],"class_list":["post-1390","post","type-post","status-publish","format-standard","hentry","category-news","tag-pbm-4860","tag-performer-gpl-980","tag-saipem","tag-tanap"],"_links":{"self":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts\/1390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/comments?post=1390"}],"version-history":[{"count":10,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts\/1390\/revisions"}],"predecessor-version":[{"id":2505,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts\/1390\/revisions\/2505"}],"wp:attachment":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/media?parent=1390"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/categories?post=1390"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/tags?post=1390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}