<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda::$AMP is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/iubenda_cookie_solution.php</b> on line <b>109</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda::$forms is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/iubenda_cookie_solution.php</b> on line <b>110</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda::$settings is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/iubenda_cookie_solution.php</b> on line <b>111</b><br />
<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>iubenda</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-includes/functions.php</b> on line <b>6260</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda_Settings::$legal_notices is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/includes/settings.php</b> on line <b>51</b><br />
<br />
<b>Deprecated</b>:  Creation of dynamic property iubenda_Settings::$tag_types is deprecated in <b>/var/www/vhosts/staging.europipeline-equipment.com/httpdocs/sito/wp-content/plugins/iubenda-cookie-law-solution/includes/settings.php</b> on line <b>72</b><br />
{"id":1352,"date":"2016-05-18T10:40:15","date_gmt":"2016-05-18T10:40:15","guid":{"rendered":"http:\/\/europipeline-equipment.com\/sito\/?p=1352"},"modified":"2021-03-17T14:30:18","modified_gmt":"2021-03-17T14:30:18","slug":"16-europipeline-equipment-performer-gpl-980-operating-in-turkey-to-contribute-to-the-building-of-tanap-project","status":"publish","type":"post","link":"https:\/\/www.europipeline-equipment.com\/sito\/16-europipeline-equipment-performer-gpl-980-operating-in-turkey-to-contribute-to-the-building-of-tanap-project\/","title":{"rendered":"16 EUROPIPELINE EQUIPMENT \u201cPERFORMER GPL 980\u201d operating in Turkey to contribute to the building of TANAP Project !"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>16 Europipeline PERFORMER GPL 980<\/strong>, bought by SICIM arrived in the Region of Sivas located in central Anatolia, to give their powerful contribution to the building of the TANAP Project. They immediately show their original and innovative design technology. In fact, they arrived dismantled into parts into two different open top containers for each model to guarantee an easy and cost saving transfer. The reassembling procedure took a very short time and it was easier than expected, contributing to a general save of 80% of the usual costs of transportation compared to the average pipe-layers commonly used in the gas market.<\/p>\n\n\n<p><iframe title=\"Performer GPL980 at TANAP Project1\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/DQr2_uLM3YQ?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">&nbsp;<\/h2>\n\n\n\n<h2 class=\"wp-block-heading\">PERFORMER GPL 980 performs perfectly with&nbsp;any climate condition<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">Even in the worst climate condition, with a full coverage of white snow, the PERFORMER GPL 980 can effectively work and give a strong contribution to the building of the &#8220;TANAP-Trans Anatolian Natural Gas Pipeline&#8221; regarding the SECTION N. 2 that will be 2,450km long &nbsp;composed of tubes of 56&#8243; size. A huge project to bring gas in Europe through Azerbaijan, Georgia, Turkey, Greece and Albania that will be completed by the end of 2017.<\/span><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"681\" src=\"https:\/\/staging.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/JLP5528-1024x681.jpg\" alt=\"Euro Pipe Line Performer GPL 980 at work in TANAP project for SICIM\" class=\"wp-image-1322\" srcset=\"https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/JLP5528-1024x681.jpg 1024w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/JLP5528-300x200.jpg 300w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/JLP5528-768x511.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">&nbsp;<\/h2>\n\n\n\n<h2 class=\"wp-block-heading\">Piping machine with 98.000 kg lift capability<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">All was made possible thanks to the strict cooperation between the producer EUROPIPELINE and SICIM that, as a partner really believed in the project giving a fundamental contribution on the conceptual side for the design of the ultimate version of the PERFOMER GPL 980 which can guarantee a capability of lifting 98,000 kg thanks to a Caterpillar engine and Bosch Rexroth components.<\/span><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img decoding=\"async\" width=\"1024\" height=\"537\" src=\"https:\/\/staging.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/006-3-1024x537.jpg\" alt=\"Euro Pipe Line Performer GPL 980 at work in TANAP project for SICIM\" class=\"wp-image-1323\" srcset=\"https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/006-3-1024x537.jpg 1024w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/006-3-300x157.jpg 300w, https:\/\/www.europipeline-equipment.com\/sito\/wp-content\/uploads\/2015\/10\/006-3-768x402.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">&nbsp;<\/h2>\n\n\n\n<h2 class=\"wp-block-heading\">Continuity of work guaranteed 24\/7<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">SICIM Spokesperson claims: <\/span><i><span style=\"font-weight: 400;\">\u201cThanks to this flexible technology solution applied to the PERFORMER GPL 980 we can easily guarantee a continuity of work flow 24\/7. If accidentally, one of the component, that can be disassembled, is out of order, it can be quickly substituted with a spare one, while the damaged component can be easily repaired without stopping the work flow\u201d<\/span><\/i><i><span style=\"font-weight: 400;\">.<\/span><\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>16 Europipeline PERFORMER GPL 980, bought by SICIM arrived in the Region of Sivas located in central Anatolia, to give their powerful contribution to the building of the TANAP Project. They immediately show their original and innovative design technology. In fact, they arrived dismantled into parts into two different open top containers for each model [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1352","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts\/1352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/comments?post=1352"}],"version-history":[{"count":4,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts\/1352\/revisions"}],"predecessor-version":[{"id":2511,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/posts\/1352\/revisions\/2511"}],"wp:attachment":[{"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/media?parent=1352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/categories?post=1352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europipeline-equipment.com\/sito\/wp-json\/wp\/v2\/tags?post=1352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}